Planning and Permits
When installing your KOYYA, understanding local building regulations is crucial. In the Netherlands, you can often build without a permit if certain conditions are met. For example, you can construct on up to 50% of a 100 m² garden area without a permit, provided existing structures, such as sheds, are included in this calculation. Additionally, the height of the structure should not exceed 4 meters. This rule applies to outbuildings like sheds, carports, garden studios, and rear extensions.
However, specific requirements and exceptions may vary based on local regulations. Team KOYYA is here to help you navigate these complexities. We aim to facilitate permit-free construction whenever possible, saving you time, energy, and costs. For projects requiring permits, it’s the responsibility of the buyer to oversee the process to ensure compliance with all legal and technical requirements
Delivery Timeframe
KOYYA cabins are manufactured and shipped from Europe, with production based in the Netherlands. Below is a breakdown of the pricing structure, including what’s included and what additional costs might apply.
The execution of your KOYYA cabin installation typically takes 12 to 16 weeks from the date of signing the contract. This timeframe depends on transport availability and external factors. The exact delivery schedule will be confirmed before signing the contract.